25% OFF SELECT CAT® G.E.T.
SHOP NOW
Data centers depend on reliable power, efficient cooling, and continuous uptime. Ohio Cat delivers integrated solutions—including generators, pumps, and rental equipment—to support every phase of your operation.
Keep your operation powered—no interruptions.
• Back-up and long-term Cat® generator sets
• Paralleling switchgear and electrical distribution
• Containerized and modular power solutions
• Backup and bridge power during commissioning
Ohio Cat delivers reliable power solutions for both temporary and permanent applications, ensuring uninterrupted performance in critical environments.
Support cooling systems and infrastructure with advanced pump solutions.
• Chilled water loop circulation
• Flush & Filtration System
• Condenser water and cooling tower support
• System flushing and chemical treatment circulation for maintenance
• Fuel transfer systems for generator operations
• Dewatering and fluid transfer for sitework
Pumps are a critical component of data center cooling, circulating fluids that remove heat and maintain system efficiency.They also play a key role in cooling, fuel management, and overall uptime reliability across data center infrastructure.
Maintain optimal operating conditions.
• Air-cooled and water-cooled chillers
• Cooling towers and heat rejection systems
• Temporary HVAC and spot cooling
• Emergency cooling during outages or maintenance
• Rental generators, transformers, and load banks
Reliable cooling is essential to prevent overheating and ensure continuous operation of critical IT systems.
Keep projects moving with flexible equipment access.
• Earthmoving and site prep equipment
• Aerial lifts and material handling
• Air compressors and tools
• Trench safety and shoring solutions
Our rental fleet ensures you have the right equipment, when and where you need it, backed by expert support.
Whether you’re building new capacity, upgrading infrastructure, or maintaining uptime, Ohio Cat provides the equipment, expertise, and support to get the job done. Browse available solutions below or connect with our team for a customized solution.
Data centers require a combination of power systems, cooling equipment, and fluid management solutions to operate efficiently. This includes generators, electrical distribution, pumps for cooling systems, and temporary equipment for construction and maintenance.
Most data centers rely on diesel or natural gas generator sets for backup and standby power. These systems are designed to provide immediate, reliable power in the event of a grid outage to ensure continuous uptime.
Pump systems play a critical role in cooling and fluid management. They circulate chilled water or coolant through the system to remove heat from servers and maintain safe operating temperatures, helping prevent downtime.
Temporary power provides short-term electricity during construction, commissioning, or maintenance. It’s commonly used before utility power is available or when systems are being tested.
Cooling systems use chillers, cooling towers, and pumps to regulate temperature. These systems continuously remove heat generated by servers to ensure performance and prevent overheating.
Construction typically requires:
Temporary generators and lighting
Pump and dewatering systems
Climate control equipment
Air compressors and tools
Earthmoving and material handling equipment
Commissioning is the process of testing and preparing all systems before full operation. This includes load bank testing, power validation, and flushing cooling systems to ensure everything performs as expected.
Yes. Backup or temporary cooling systems are critical to maintaining uptime during maintenance, upgrades, or unexpected failures, ensuring continuous operation.
Never miss out on the latest news & specials when you subscribe to Ohio CAT® marketing updates